Strategic Plan for LTPP Data Analysis

Topic:
Pavements
Document Type:
Other
Publication Year:
1999
Description:

The Strategic Objectives of the national-level analysis effort are as follows. Each Objective is important to the achievement of the overall goal. The specific Long-Term Pavement Performance (LTPP) Analysis Outcomes expected to address these Objectives are shown on the listed objective.

Strategic Objective 1 Improve traffic characterization and prediction

Strategic Objective 2 Improve materials characterization

Strategic Objective 3 Improve consideration of environmental effects in pavement design and performance prediction

Strategic Objective 4 Improve evaluation and use of pavement condition data in pavement management

Strategic Objective 5 Evaluate existing and/or develop new pavement response and performance models applicable to pavement design and performance prediction

Strategic Objective 6 Provide guidance for maintenance and rehabilitation strategy selection and performance prediction

Strategic Objective 7 Quantify the performance impact of specific design features (presence or absence of positive drainage,differing levels of pre-rehab surface preparation,etc.)

Organization Category:
Federal
Organization Name:
Federal Highway Administration
Country:
United States of America
State:
Washington
Contact Person:
Aramis Lopez
Email Address:

Document Type: Other

Created at: 01/18/2021 03:01 PM By: iENGINEERING

Last Modified at: 01/18/2021 03:01 PM By: