This document is a template for CALTRANS research project deployment plans.
Plan
Deployment Plan – Example
This document is an example for CALTRANS research project deployment plans.
Deployment Plan V4 – Outline
This document is an outline for CALTRANS research project deployment plans.
KDOT Research Project Implementation Plan
This document is a template for KS DOT’s research project implementation plans.
Strategic Communication Plan for the National Strategy on Highway Safety
Implementation of Research Results
ACRP Dissemination Plan
Infravation: Defining the Scope of the Infravation ERA-Net Plus
This scoping document covers seven challenges: 1) Advanced predictive infrastructure performance processes; 2) Enhanced durability and life-time extension; 3) Rapid and non-destructive methods for routine quality and performance checks of materials and construction; 4) Keeping freight routes open through zero-intrusive maintenance; 5) Ensuring infrastructure performance under all weather conditions; 6) Resource and energy efficiency in road construction and maintenance (eco-design); and 7) Virgin material reduction by substitution or recycling.